Contract award by British Gypsum Limited for redundant plant removal

Contract award by British Gypsum Limited for redundant plant removal

Contract award by British Gypsum Limited for redundant plant removal.

British Gypsum Limited has placed a contract with B.D.B for the removal of redundant tanks located on an upper floor of a production plant. The tanks are located within the live production facility and require decontamination and cleaning prior to removal, materials arising require transporting through live production areas and lowering to ground level for disposal.

 
PLEDGE TUV NORD NATIONAL DEMOLITION TRANING GROUP SAFE CONTRACTOR CHAS concom RoSPA Member