Contract award by British Gypsum Limited for redundant plant removal.
British Gypsum Limited has placed a contract with B.D.B for the removal of redundant tanks located on an upper floor of a production plant. The tanks are located within the live production facility and require decontamination and cleaning prior to removal, materials arising require transporting through live production areas and lowering to ground level for disposal.