The selective site clearance of redundant hoppers, conveyors
and exchange houses.
Control of site roads and pedestrian walkways.
Processing and disposal off site of scrap created.
A full project assessment was undertaken to allow for project
and site specific risk assessments to be carried out. These
addressed such issues as working at height and the client’s
use of roadways within the project area.
Site and project specific method statements were developed
for the client’s review and comment to address such issues.
Frequent meetings were held at all levels (ranging from
management to toolbox talks with the site operatives) to
ensure that an adequate flow of essential information was
provided.
This ensured that the highest Health, Safety and
Environmental standards were maintained.
Validation of the project’s compliance to SHE legislation was
essential for the future development of site. All relevant
information required by the Planning Supervisor/Coordinator
was efficiently supplied allowing the completion of the
Health & Safety File (including full traceability of all
materials arising).